BIM management

BIM Management has a wide scope that includes different roles, depending on whether we are talking about a BIM project or a company.
In Switzerland, the BIM manager must know and apply the SIA 2051 for international projects. The ISO 19650 and the UniFormat specifications must also be integrated.

BIM management of project data and interoperability are at the heart of this new activity.

Better understand the concept of BIM Management

BIM Management, or building BIM, information (LOI) and graphics (LOG) project management, is a construction project management method that uses digital technologies to manage and use information about a building throughout its life cycle.

With BIM management, the various stakeholders on a construction project – architects, engineers, contractors, etc. – can work together on a Common Data Environment (CDE) which guarantees the same level of information for everyone. This allows for better coordination and communication between project stakeholders, which leads to a reduction in errors and delays, as well as an improvement in the overall quality of the program.

By using high-precision 3D models (LOD 350), BIM management allows better planning and better forecasting of project costs, which leads to a significant benefit on the risk and contingency part of a project.

BIM Management also includes data management, which means that all project information is stored centrally and is accessible to all stakeholders. This allows for better collaboration and better traceability of changes made to the project.

In summary, BIM Management is a project management method that uses digital technologies to improve the coordination, communication and quality of a construction project, while reducing costs and improving planning.